North Carolina | Rockingham County
Mayo River
Anglin Mill / Mayo Beach to Business 220
Check current paddling conditions for this Mayo River route, including water level, recent gauge trend, weather, and route details.
Route location
Loading the route snapshot. This usually takes a few seconds.

Need to know
Why this call
Safety
Route safety
Advanced routeThis route has hazards that can create serious consequences if missed or misjudged. Paddle only with appropriate skill, equipment, and current local information.
Safety details
Piedmont Trails describes the Anglin Mill to Business 220 section as an advanced 10-mile run with the Boiling Hole at Mayo Beach and roughly a dozen Class I–II rapids downstream. Use an experienced moving-water team, fitted PFDs, and rescue gear appropriate to the group.
- The 150 / 250 / 1,000 cfs cues are local planning references tied to the Mayo gauge; they do not certify safe depth or hydraulics. Rising water, recent rain, wood, bridge hazards, and visual conditions override the numbers.
- Business 220 is a mandatory take-out before the dams. Do not put in there, miss the take-out, or attempt a dam approach or improvised portage. Scout the finish from the access side before launching.
- Use the documented Anglin Mill / Mayo Beach access and Business 220 access only. Verify the current park status, parking, river-side landing, and the separate management status of the Business 220 access.
Conditions
Gauge history and hourly forecast
The top card is the quick read. This lower section keeps the longer gauge trend, gauge context, and hourly forecast together.
Gauge detail
Gauge history & hourly forecastDetailed view
Gauge note
Target band: 250 cfs to 800 cfs · Mayo River near Price, NC
Gauge context
Use direct USGS 02070500 near Price. Piedmont Trails cites 150 cfs / 1.75 ft as a minimum cue, 250 cfs / 2.0 ft as a medium reference, and 1,000 cfs / 3.5 ft as dangerous; this card uses the discharge cues as a conservative planning band, not a runnable guarantee. The Business 220 access is take-out only because of the dam ahead. Recheck live flow, trend, rainfall, debris, park access, and the Boiling Hole before launch.
Gauge
Recent trend
Checking preferred range.
Checking trend.
Gauge source
--Checking timestampMN DNR provides the current paddling level here, but not chart-ready recent samples.
Weather
Hourly forecast
Checking weather.
Loading today's forecast.
Next 8 hours
Short-route forecast
Checking the next several hours.
Route overview
Quick facts and what's next
Distance, difficulty, shuttle basics, and the near-term outlook before you commit to the drive.
Quick facts
Plan ahead
Upcoming outlook
These are early planning reads. Re-check live conditions before you commit to the drive.
Waiting on forecast.
Waiting on forecast.
Plan
Plan your trip
Launch points, shuttle details, distance, and access notes.
Route logistics
Access and shuttle
An advanced Mayo River day run with a Class II–III upper feature, direct discharge telemetry, local flow cues, and an explicit pre-dam take-out.
Prepare this trip
Take the plan with you
Download the canonical route, add a calendar hold, or send a simple float plan to your group.
Put-in
Anglin Mill / Mayo Beach AccessNorth Carolina State Parks lists Anglin Mill / Mayo Beach at 108 Mayo Beach Road, Stoneville, and identifies U.S. 220 as an access that is not managed by the state park. Confirm the access owner, parking, and river-side landing before travel.
Take-out
Business 220 AccessPiedmont Trails notes the Business 220 access is take-out only because of the dam ahead and that the 770 access is closed for bridge replacement until further notice. Do not substitute an unverified downstream access.
Plan this segment
Pulling access map tiles. Usually under 5 seconds.
Access caveats and watch for
Access caveats
- North Carolina State Parks lists Anglin Mill / Mayo Beach at 108 Mayo Beach Road, Stoneville, and identifies U.S. 220 as an access that is not managed by the state park. Confirm the access owner, parking, and river-side landing before travel.
- Piedmont Trails notes the Business 220 access is take-out only because of the dam ahead and that the 770 access is closed for bridge replacement until further notice. Do not substitute an unverified downstream access.
Watch for
- flow below 150 cfs
- flow above 1,000 cfs
- rapid rise after rain
- Boiling Hole
- Class I–II rapids
- rock and fish weir hazards
- strainers and debris
- missed Business 220 take-out
- dam ahead
- access closures
- cold water
Route gallery
See this route on the water
Photos help show what the access looks like and what the route actually feels like on the water.
No approved route photos yet
Start the gallery with shots of the access, river character, or any detail that helps paddlers know what this run actually looks like.
Score & sources
Why this score
See the gauge, weather, and source notes behind today's call.
Why this scoreToday's evidence strength is checking
Evidence strength mostly comes down to three things: how direct the active gauge is, how clear the range is, and how fresh the data is.
- Checking evidence-strength notes.
- Checking evidence cautions.
Data behind the scoreGauge, thresholds, and timing
These are the live readings and threshold notes behind today's score.
| Gauge site | Mayo River near Price, NC |
| Discharge | Checking |
| Gauge height | Checking |
| 24h trend | Checking |
| 24h change | Checking |
| Current band | Checking |
| Rain last 24h | Checking |
| Rain last 72h | Checking |
| Air temp | Checking |
| Water temp | Checking |
| Wind | Checking |
| Gusts | Checking |
| Rain timing | Checking |
| Target band | 250 cfs to 800 cfs |
| Low threshold | 150 cfs |
| High threshold | 1,000 cfs |
| Evidence strength behind the range | Local route guidance |
| Gauge observed | Checking |
| Paddle Today updated | Checking |
| Main source behind this score | Piedmont Trails Mayo River flow guidance |
| Gauge source | Checking |
| Weather source | Checking |
| Rainfall source | Checking |
NotesWhat to know before you go
These notes cover the access details, route quirks, and source caveats most likely to matter once you get there.
- Named route sectionAnglin Mill / Mayo Beach to Business 220; 10 miles; advanced
Piedmont Trails publishes the endpoint pair, 10-mile distance, advanced difficulty, and the route sequence.
- Endpoint coordinatesAnglin Mill 36.535389, -79.990588; Business 220 36.439153, -79.937981
Piedmont Trails publishes practical GPS anchors for both accesses and identifies the Business 220 landing as take-out only.
- Feature and dam hazardBoiling Hole Class II–III; Business 220 mandatory take-out before dams
The route guide and the state-park map identify the upper feature and downstream dam warning; the product does not encourage continuing beyond the stored endpoint.
- State-park access contextAnglin Mill / Mayo Beach Access, 108 Mayo Beach Road, Stoneville
North Carolina State Parks lists the named access, address, paddling activity, and separate management status for U.S. 220.
- Station-specific flow guidance150 cfs / 1.75 ft minimum cue; 250 cfs / 2.0 ft medium reference; 1,000 cfs / 3.5 ft dangerous cue
Piedmont Trails supplies local planning references for the Mayo River. Paddle Today stores discharge thresholds and requires same-day visual, weather, debris, and access checks.
- Direct live gaugeUSGS 02070500; 87.3 cfs and 0.88 ft at 2026-08-27 17:45 EDT
The reviewed observation was below the local minimum cue, so this route should not be treated as launch-ready from that snapshot. Recheck current provisional telemetry and trend before every trip.
- Image decisionNo route-specific image selected; approved Mayo River context image used
No route-specific image was copied into the repository; the preview uses a rights-clean Mayo River State Park context image and does not imply endpoint coverage.
Verify it yourselfCheck the source links
Use these links to double-check the gauge, route details, and access notes before you head out.
Paddler reports
Recent notes from paddlers
A few quick notes from people who were on this route recently.
Reports
Paddler reports
See recent photos and notes from people on the route.
Share your trip
Keep exploring
More routes to check next
Compare another stretch on this river, or jump to nearby options before you pick a plan.
Quick answers
Mayo River paddling FAQ
What water level is good for paddling Mayo River?
Paddle Today watches Mayo River near Price, NC and treats 250 cfs to 800 cfs as the target band for this route, with weather and recent trend included in the final score.
Where does this Mayo River route start and end?
This route starts at Anglin Mill / Mayo Beach Access and ends at Business 220 Access, about 10 river miles on the water.
Is this Mayo River route good for beginners?
This is listed as a hard route. Treat the live score as a planning aid, then confirm conditions, hazards, access, and group skill before launching.
Flag a change
See something outdated?
Access, hazards, wood, and shuttle details change. Send a quick correction if something looks off.

