See all 42 routes on Mississippi River
Minnesota | Grand Rapids Area
Mississippi River
Blackberry Bridge to County Road 72
Route planning details, access notes, and local verification guidance.
Route location
Loading the route coverage map.

Need to know
Why this call
Safety
Route safety
CautionThis route has hazards or access considerations that require extra verification.
Safety details
Use the named public accesses; much of the farmland and wooded shoreline between Blackberry Bridge and County Road 72 should be treated as private unless signed otherwise.
- Low water can expose shallow riffles and bars even when the broader DNR gauge band is usable.
- Wind, cold water, floating debris, and a limited number of clean intermediate exits make the 9.5-mile split more committing than a short town float.
Conditions
Gauge history and hourly forecast
Use the gauge context and hourly forecast to verify local conditions before launching.
Gauge detail
Gauge history & hourly forecastDetailed view
Gauge note
Proxy gauge: Mississippi River at Grand Rapids, MN. Regional signal only; verify local water.
Gauge context
This route uses Mississippi River at Grand Rapids, MN as a proxy gauge. It is a regional signal, not a measurement of this reach. Verify local water and hazards before launching.
Gauge
Recent trend
Checking preferred range.
Checking trend.
Gauge source
--Checking timestampMN DNR provides the current paddling level here, but not chart-ready recent samples.
Weather
Hourly forecast
Checking weather.
Loading today's forecast.
Next 8 hours
Short-route forecast
Checking the next several hours.
Route overview
Quick facts and what's next
Distance, difficulty, shuttle basics, and the near-term outlook before you commit to the drive.
Quick facts
Plan ahead
Upcoming outlook
These are early planning reads. Re-check live conditions before you commit to the drive.
Waiting on forecast.
Waiting on forecast.
Plan
Plan your trip
Launch points, shuttle details, distance, and access notes.
Route logistics
Access and shuttle
Launch at Blackberry Bridge and take out at County Road 72 for a 9.5-mile upper-Mississippi day section below Grand Rapids. Use the upstream Grand Rapids DNR gauge as a corridor check and make a same-day wind, debris, and shallow-riffle call.
Prepare this trip
Take the plan with you
Download the canonical route, add a calendar hold, or send a simple float plan to your group.
Put-in
Mississippi River, Blackberry Bridge Public Water Access SiteBlackberry Bridge is a DNR public access already used as the downstream endpoint of the existing Steamboat-to-Blackberry card.
Take-out
Mississippi River, Co Rd 72 Public Water Access SiteCounty Road 72 resolves in the DNR public-water-access layer as a DNR-managed Mississippi River access at river mile 1161.4 with no restroom listed.
Plan this segment
Access caveats and watch for
Access caveats
- Blackberry Bridge is a DNR public access already used as the downstream endpoint of the existing Steamboat-to-Blackberry card.
- County Road 72 resolves in the DNR public-water-access layer as a DNR-managed Mississippi River access at river mile 1161.4 with no restroom listed.
- The Grand Rapids gauge is upstream of this split. It is official and same-corridor, but not a take-out reading.
Watch for
- Small riffles, exposed bars, and slower travel when the Grand Rapids gauge is near the low band.
- Wind on open bends, floating debris, and cold-water exposure.
- Private banks and limited clean intermediate exits between the two DNR accesses.
Route gallery
See this route on the water
Photos help show what the access looks like and what the route actually feels like on the water.

Score & sources
Data and sources
See the gauge, weather, and source notes behind today's call.
Why this scoreToday's evidence strength is checking
Evidence strength mostly comes down to three things: how direct the active gauge is, how clear the range is, and how fresh the data is.
- Checking evidence-strength notes.
- Checking evidence cautions.
Data behind the scoreGauge, thresholds, and timing
These are the live readings and threshold notes behind today's score.
| Gauge site | Mississippi River at Grand Rapids, MN |
| Discharge | Checking |
| Gauge height | Checking |
| 24h trend | Checking |
| 24h change | Checking |
| Current band | Checking |
| Rain last 24h | Checking |
| Rain last 72h | Checking |
| Air temp | Checking |
| Water temp | Checking |
| Wind | Checking |
| Gusts | Checking |
| Rain timing | Checking |
| Target band | 44 cfs to 1,410 cfs |
| Low threshold | 30 cfs |
| High threshold | 1,910 cfs |
| Evidence strength behind the range | Official data source |
| Gauge observed | Checking |
| Paddle Today updated | Checking |
| Main source behind this score | MN DNR river-level interpretation bands for Mississippi River at Grand Rapids |
| Gauge source | Checking |
| Weather source | Checking |
| Rainfall source | Checking |
NotesWhat to know before you go
These notes cover the access details, route quirks, and source caveats most likely to matter once you get there.
- Official route splitBlackberry Bridge river mile 1170.9 to County Road 72 river mile 1161.4
MN DNR recommended-one-ways lists Steamboat Landing to County Road 72 as a 17.5-mile Map 3 route; the existing app card covers Steamboat-to-Blackberry, leaving this 9.5-mile downstream public-access pair.
- Public access recordsWAS02539 to WAS01345
Minnesota public-water-access GIS resolves Blackberry Bridge and Mississippi River, Co Rd 72 with DNR access IDs, coordinates, public administrators, and matching river-mile records.
- Official DNR bands30 / 44-1410 / 1910 cfs
MN DNR interprets the Grand Rapids gauge as Scrapable below 30 cfs, Low from 30 to 44, Medium from 44 to 1410, High from 1410 to 1910, and Very High above 1910.
- Current gauge check251 cfs at 2026-07-16 02:45 PM
The current MN DNR feed placed the upstream Grand Rapids gauge in the official medium band during this run.
- Route characterEasy upper-Mississippi day water
DNR describes the broader planner route as farmland and wooded banks with no significant rapids, while noting small riffles can appear at low water.
Verify it yourselfCheck the source links
Use these links to double-check the gauge, route details, and access notes before you head out.
Paddler reports
Recent notes from paddlers
A few quick notes from people who were on this route recently.
Reports
Paddler reports
See recent photos and notes from people on the route.
Share your trip
Keep exploring
More routes to check next
Compare another stretch on this river, or jump to nearby options before you pick a plan.
Quick answers
Mississippi River paddling FAQ
What water level is good for paddling Mississippi River?
Paddle Today watches Mississippi River at Grand Rapids, MN and treats 44 cfs to 1,410 cfs as the target band for this route, with weather and recent trend included in the final score.
Where does this Mississippi River route start and end?
This route starts at Mississippi River, Blackberry Bridge Public Water Access Site and ends at Mississippi River, Co Rd 72 Public Water Access Site, about About 9.5 mi on the water.
Is this Mississippi River route good for beginners?
This is listed as an easy route, but conditions still matter. Check today's score, water level, weather, and access notes before you go.
Flag a change
See something outdated?
Access, hazards, wood, and shuttle details change. Send a quick correction if something looks off.
