Virginia | Radford / Pulaski County

New River

Bisset Park / Dudley’s Landing to Peppers Ferry

Check current paddling conditions for this New River route, including water level, recent gauge trend, weather, and route details.

Route location

Loading the route snapshot. This usually takes a few seconds.

Open access map
DistanceApproximately 5.5 river miles
DifficultyModerate
Typical time2–4 hours depending on flow
ShuttleCar shuttle
The New River runs through the forested New River Gorge in West Virginia.
River contextNew River Gorge river character river-level context — not necessarily this exact reach.Photo by Malik Ahamed via Wikimedia Commons

Need to know

Why this call
Pulling the latest gauge and weather. This usually takes a few seconds.
View Primary Source

Route alerts

Email me when this route improves

We'll email you when this route climbs into Good or Strong. Every email includes an unsubscribe link.

We only email on a new threshold crossing.

Gauge history and hourly forecast

The top card is the quick read. This lower section keeps the longer gauge trend, gauge context, and hourly forecast together.

Gauge history & hourly forecastDetailed view

Recent trend

Checking preferred range.

Checking trend.

------------

Hourly forecast

Checking weather.

Loading today's forecast.

Short-route forecast

Checking the next several hours.

Checking the best short-route window.
----Loading--

Quick facts and what's next

Distance, difficulty, shuttle basics, and the near-term outlook before you commit to the drive.

DifficultymoderateThe published split is approximately 5.5 miles of generally mild Class I–II moving water; plan for changing current, bridge/shoreline hazards, cold water, and limited legal exits.
PermitsNone notedNo route-specific permit is published for these public accesses. Follow current Virginia boating, PFD, DWR, city, and posted access rules and all temporary closure notices.
CampingDay tripNo on-route or access-site camping is assumed. Use separately managed regional lodging or a lawful campground after confirming availability; a public access does not grant riverbank camping rights.
SeasonMar-NovCheck USGS 03171000 stage and trend, Claytor release notices, recent and forecast rain, water temperature, debris, daylight, and access status immediately before launch.

Upcoming outlook

These are early planning reads. Re-check live conditions before you commit to the drive.

TomorrowChecking

Waiting on forecast.

WeekendChecking

Waiting on forecast.

Plan your trip

Launch points, shuttle details, distance, and access notes.

Access and shuttle

A named lower Claytor Dam–Peppers Ferry split with public Radford and Peppers Ferry accesses, direct 03171000 stage telemetry, conservative 2–7 ft guidance, and generally mild Class I–II water.

Take the plan with you

Download the canonical route, add a calendar hold, or send a simple float plan to your group.

Start

Put-in

Bisset Park Boat Ramp / Dudley’s Landing
Open map

Use only the documented Bisset Park/Dudley’s Landing and Peppers Ferry public accesses; verify current parking, ramp condition, and posted rules before launch.

Finish

Take-out

Peppers Ferry public access
Open map

Confirm the Peppers Ferry take-out is open and suitable for the group before committing; do not substitute an unverified roadside pullout or private bank.

Plan this segment

Pulling access map tiles. Usually under 5 seconds.

Access caveats and watch for

Access caveats

  • Use only the documented Bisset Park/Dudley’s Landing and Peppers Ferry public accesses; verify current parking, ramp condition, and posted rules before launch.
  • Confirm the Peppers Ferry take-out is open and suitable for the group before committing; do not substitute an unverified roadside pullout or private bank.
  • Camping is not assumed at either access or along private riverbank; arrange separate lawful lodging or campground reservations.

Watch for

  • USGS 03171000 below 2 ft, above 7 ft, rapidly rising, unavailable, or inconsistent with the river visual
  • Claytor release changes, cold water, debris, bridge hydraulics, strainers, and limited legal exits
  • access or parking closures, thunderstorms, daylight loss, and failed shuttle plans

Why this score

See the gauge, weather, and source notes behind today's call.

Read quality
Checking live inputs.

Pulling the latest gauge and weather. Usually under 10 seconds.

Gauge inputChecking

Waiting on the gauge read.

Weather inputChecking

Waiting on weather.

Next stepChecking

Waiting on enough data to give the next step.

Today's evidence strength is checking

Evidence strength mostly comes down to three things: how direct the active gauge is, how clear the range is, and how fresh the data is.

  • Checking evidence-strength notes.
Gauge, thresholds, and timing

These are the live readings and threshold notes behind today's score.

Gauge siteNew River at Radford, VA
Gauge heightChecking
DischargeChecking
24h trendChecking
24h changeChecking
Current bandChecking
Rain last 24hChecking
Rain last 72hChecking
Air tempChecking
Water tempChecking
WindChecking
GustsChecking
Rain timingChecking
Target band2.50 ft to 6.00 ft
Low threshold2.00 ft
High threshold7.00 ft
Evidence strength behind the rangeOfficial and local sources
Gauge observedChecking
Paddle Today updatedChecking
Main source behind this scoreAmerican Whitewater Radford reach correlation: 2.0 ft low-runnable minimum to 7.0 ft high-runnable maximum
Gauge sourceChecking
Weather sourceChecking
Rainfall sourceChecking
What to know before you go

These notes cover the access details, route quirks, and source caveats most likely to matter once you get there.

  • Named public corridorClaytor Dam to Peppers Ferry; Bisset Park/Dudley’s Landing split; approximately 5.5 river miles

    Virginia DWR names the corridor and Radford city materials identify the public Bisset/Dudley’s Landing access.

    Source

  • Direct live gauge and thresholdUSGS 03171000 stage; 2.0–7.0 ft American Whitewater runnable band

    American Whitewater publishes the station-specific Radford correlation. Treat it as a conservative planning screen and confirm live trend and releases.

    Source

  • Public endpoints and access coordinatesBisset Park/Dudley’s Landing to Peppers Ferry

    Radford and DWR access materials identify the public endpoints and the implementation uses source-backed coordinates.

    Source

  • Camping logisticsNo on-route camping assumed; nearby basecamp only

    The documented accesses are day-use launch/take-out facilities; arrange separate lawful lodging or camping.

    Source

  • Rights-clean image decisionNo route-specific image copied; approved New River context image used

    The preview uses the approved same-river New River context image from the route gallery; it is not presented as an endpoint photograph.

    Source

Check the source links

Paddler reports

See recent photos and notes from people on the route.

Help build the route page

Add photos or send a quick condition report.

Photos

Upload route photos

Add access, hazard, or on-water photos.

No files selected yet.

Compare another stretch on this river, or jump to nearby options before you pick a plan.

New River paddling FAQ

What water level is good for paddling New River?

Paddle Today watches New River at Radford, VA and treats 2.50 ft to 6.00 ft as the target band for this route, with weather and recent trend included in the final score.

Where does this New River route start and end?

This route starts at Bisset Park Boat Ramp / Dudley’s Landing and ends at Peppers Ferry public access, about Approximately 5.5 river miles on the water.

Is this New River route good for beginners?

This is listed as a moderate route. Expect more planning than an easy float, and use the live score, route notes, and source links before committing.

See something outdated?

Access, hazards, wood, and shuttle details change. Send a quick correction if something looks off.