Arkansas | Ouachita Mountains

Ouachita RiverRemmel Dam to Ouachita River Whitewater Park

About 5.9 miles from Remmel Dam to Rockport Whitewater Park. This rating follows recreational floating conditions, with 3–4 hours allowed on a confirmed release. Low-flow whitewater kayaking is a separate decision. Check Entergy's current release timing and plan the ledge and left-bank exit before I-30.

Route location

Loading the route snapshot. This usually takes a few seconds.

Open access map
DistanceAbout 5.9 to 6 mi
DifficultyModerate
Typical timeAbout 3 hr to 4 hr during a confirmed recreational release
ShuttleCar shuttle
Remmel Dam spans the Ouachita River with release water below the concrete spillway and wooded banks nearby.
Route photoRemmel Dam on the Ouachita RiverPhoto by Valis55 via Wikimedia Commons
View primary source
Embed this route

Route alerts

Email me when this route improves

We'll email you when this route climbs into Good or Strong. Every email includes an unsubscribe link.

We only email on a new threshold crossing.

Trip details

Access rules, camping and seasonal notes.

Permits, camping and season
PermitsNone notedNo route-specific private paddling permit is known for normal private use, but this is a dam-release corridor with posted access rules. Follow Entergy signs, Arkansas boating and PFD rules, no-glass and litter rules, park rules at the Whitewater Park, and any current release or closure notices.
CampingDay tripTreat this as a daylight day trip. Entergy closes the Remmel Dam tailrace gate nightly and has specifically acted against unauthorized camping below the dam because water can rise rapidly during storms or operations.
SeasonMay-SepEntergy describes a usual summer-weekend release pattern between Memorial Day and Labor Day, with changes possible without notice. Verify the actual release and finish window for the trip date, including outside that season. Kayak passage at lower water is a separate whitewater judgment and is not what this recreational-float rating evaluates.

Access and shuttle

Launch below Remmel Dam and take out at Ouachita River Whitewater Park for the 5.9-mile Rockport / Malvern float, typically three to four hours on a recreational release. Check Entergy's current release schedule and same-day weather before launching. Move left as I-30 comes into view and plan the take-out before Rockport Ledge and fast current make a return ferry difficult.

Access map

Skip map

Pulling access map tiles. Usually under 5 seconds.

End of map
Start

Put-in

Remmel Dam tailrace / below-dam river access
DirectionsOpen map

The put-in coordinate is a practical Remmel Dam gauge/access-area anchor, not a survey-grade boat-ramp point. Use Entergy signs and the posted gate/parking layout to find the active launch.

Finish

Take-out

Ouachita River Whitewater Park / Rockport
DirectionsOpen map

The Remmel Dam gate closes nightly at 10 p.m.; retrieve vehicles before the gate closes and do not depend on overnight access.

Road shuttle

Stage the take-out at Ouachita River Whitewater Park, 904 Riverview Drive in Malvern, then drive back toward the Remmel Dam access. Entergy says the floating entrance is a boat ramp near the dam through the gate just past the operations entrance at 170 Remmel Dam Road, and its safety page also lists Ouachita River Access Below Remmel Dam at 489 McGuire Road. Follow current signs, gates, parking marks, and any Entergy access changes on arrival.

Additional access notes
  • Entergy says some navigation apps may misroute users near Remmel Dam. From I-30, use Exit 98B / Highway 270 toward Hot Springs and confirm the signed dam access in daylight.
  • At the take-out, Entergy says to move to the left bank when the I-30 bridge comes into view. The boat ramp is on the left after the rapid but before the bridge; missing it can leave paddlers fighting current back upstream.
More route and safety guidance
  • Rockport Ledge and nearby chutes can flip, pin, or swamp boats near the take-out; scout and skip if the group cannot manage whitewater hazards.
  • Move to the left bank when the I-30 bridge comes into view and make the signed take-out before conditions force a difficult upstream ferry.
Terms and safety
More trip guidance

Plan around the Remmel release and exit

This rating follows recreational floating. The lower-flow whitewater range is a different decision; release timing, travel time and the Rockport take-out still need to work together.

Match the rating to recreational floating

Entergy says below 3,200 cfs may be too low for an enjoyable float and above 4,000 cfs is not recommended for floating. The 3,500–4,000 cfs target follows AW’s normal-generation description. Lower kayakable flows do not establish the same float experience. A reading in the target band does not verify how long generation will continue.

Check the current operating notice

Entergy’s published summer pattern is not a reservation for your trip date. Check its lake and flow news and the live Remmel gauge before driving, especially outside the usual Memorial Day–Labor Day recreational season.

Leave time before the release ends

Entergy describes a three-to-four-hour float and advises starting at least two hours before recreational flow ends. Stops and slower groups need more margin because water can drop quickly after generation stops.

Inspect the Whitewater Park finish first

The planned exit is at 904 Riverview Drive. Entergy places the left-bank ramp after the rapid and before I-30, with current that can carry paddlers past it. Identify the exit before setting the shuttle.

Guides and maps checked . We have not inspected this trip in person. Check with the launch manager for current access and closures.

Plan this paddle

Choose your trip times

No account needed. Check the selected access points above, then choose both dates and times. For an overnight paddle, set take-out to the following date.

Trip schedule

Times use the selected time zone. Check it against the river’s location before saving or sharing.

Browser plans stay on this device. Sharing opens your device’s share tools or gives you text to copy.

Download GPX Route geometry only; no schedule required.

Conditions

Check how the river is changing and what weather to expect.

Recent trend

Checking preferred range.

Checking trend.

------------
Detailed weather

Hourly forecast

Checking weather.

Loading today's forecast.

Short-route forecast

Checking the next several hours.

Checking the best short-route window.
----Loading--

Tomorrow and the weekend

Forecasts can change. Check current conditions again before leaving.

TomorrowChecking

Waiting on forecast.

WeekendChecking

Waiting on forecast.

Station details and river cameras

Sources and methodology

Guides and maps checked 2026-10-20. We have not inspected this trip in person.

Data reliability: checking
Data status
Checking live inputs.

Pulling the latest gauge and weather. Usually under 10 seconds.

Gauge inputChecking

Waiting on the gauge read.

Weather inputChecking

Waiting on weather.

Next stepChecking

Waiting on enough data to give the next step.

This rating reflects whether the gauge measures this part of the river, whether published water-level guidance is available, and how recently the data was updated.

  • Checking data sources and update times.
Water levels, published guidance and update times

These readings and published water-level limits help explain today’s score.

Gauge siteOuachita River at Remmel Dam above Jones Mill, AR
DischargeChecking
Gauge heightChecking
24h trendChecking
24h changeChecking
Current bandChecking
Rain last 24hChecking
Rain last 72hChecking
Air tempChecking
Water tempChecking
WindChecking
GustsChecking
Rain timingChecking
Preferred range3,500 cfs to 4,000 cfs
Low threshold3,200 cfs
High threshold4,000 cfs
Evidence strength behind the rangeOfficial and local sources
Gauge observedChecking
Paddle Today updatedChecking
Main source behind this scoreEntergy recreational-floating limits; AW normal-generation target
Gauge sourceChecking
Weather sourceChecking
Rainfall sourceChecking
Published evidence and verification notes

These notes cover the access details, route quirks, and source caveats most likely to matter once you get there.

  • Official float logisticsRemmel Dam to Whitewater Park

    Entergy says weekend summer floaters bring tubes, kayaks, and canoes to Remmel Dam and exit at Ouachita River Whitewater Park in Malvern, with the access gate just past the Remmel Dam operations entrance and the exit at 904 Riverview Drive.

    Source

  • Gauge check during route review · June 1, 2026USGS 07359002

    This reading was saved when we checked the guide. It is not today’s water level. Check the current gauge and local conditions before paddling.

    Source

  • Threshold modelRecreational floating: 3,200 / 3,500–4,000 / 4,000 cfs

    The model uses Entergy's low-float reference and above-4,000 floating warning, with AW's normal-generation description as its target. AW separately lists 500–5,000 cfs for whitewater and describes scraping at 200–500 cfs. Those lower kayakable levels are not a general float recommendation. This score does not confirm the release schedule or clear Rockport Ledge.

    Source

  • Rating activity and release durationRecreational floating; release must be confirmed

    Entergy advises starting at least two hours before recreational flow ends, while describing a 3–4-hour float. Confirm a workable departure, daylight, stops and landing margin for the group. Its current plans can change without notice, so a high current reading or a summer calendar pattern alone does not establish the trip window.

    Source

  • Whitewater reach match5.9 mi Class I-II

    American Whitewater identifies Remmel Dam to I-30 at Malvern as a 5.9-mile I-II reach on the Ouachita River, with Rockport Ledge near the take-out and a warning that some chutes can flip, pin, or swamp canoes.

    Source

  • Access coordinatesRemmel gauge/access area 34.426111, -92.890833; Whitewater Park 34.39427, -92.84158

    The put-in coordinate is the USGS/AW Remmel Dam gauge/access-area anchor adjacent to Entergy's below-dam access instructions. Mapcarta/OpenStreetMap places Ouachita River Whitewater Park at 904 Riverview Drive with coordinates 34.39427, -92.84158.

    Source

  • Dam-release safetyGate hours, release changes, and cold tailwater

    Entergy warns release plans can change without notice, the Remmel Dam gate closes nightly at 10 p.m., no-parking zones are marked at the dam, and the take-out current can push paddlers past the Whitewater Park ramp if they miss the left-bank exit.

    Source

Check the source links
Other routes nearby

See something outdated?

Access, hazards, wood, and shuttle details change. Send a quick correction if something looks off.