Wisconsin | South Central Wisconsin

Yahara RiverHighway N / Dunkirk to Highway 59

Lower Yahara free-flowing day route from the better Highway N bridge access below Dunkirk Dam through the Stebbinsville recovery reach to the Highway 59 bridge/gauge access.

Route location

Loading the route map.

Open access map
DistanceAbout 6.9 mi
DifficultyEasy
Typical timeAbout 2.5 hr to 4 hr
ShuttleCar shuttle
The Yahara River meets the Rock River at Fulton, Wisconsin.
River contextMouth of the Yahara River river-level photo — not necessarily this exact reach.Photo by TheCatalyst31
View primary source
Embed this route

Route alerts

Email me when this route improves

We'll email you when this route climbs into Good or Strong. Every email includes an unsubscribe link.

We only email on a new threshold crossing.

Trip details

Access rules, camping and seasonal notes.

Permits, camping and season
PermitsNone notedNo route-specific paddling permit is known. Follow Wisconsin boating/PFD rules, avoid blocking bridge shoulders or farm access, and obey any posted bridge, dam, or construction restrictions.
CampingOptions nearbyTreat this as a day route. No on-route camping is documented, and banks outside public bridge/access areas should be treated as private unless clearly signed otherwise.
SeasonApr-OctSpring through fall works when the Fulton gauge is inside the WRT ladder. Low summer water exposes shallow riffles and boulder gardens; high water hides the character and increases wood risk.

Access and shuttle

Launch from Highway N below Dunkirk Dam and continue through the Stebbinsville recovery reach to Highway 59. This avoids using Stebbinsville as a default endpoint while preserving the best lower-Yahara riffles and boulder gardens.

Access map

Skip map

Pulling access map tiles. Usually under 5 seconds.

End of map
Start

Put-in

Highway N bridge access below Dunkirk Dam
DirectionsOpen map

Highway N is the planned launch because WRT describes it as better than starting at Dunkirk Dam. Stay downstream of the dam/intake unless a separate scout and portage plan is intentional.

Finish

Take-out

Highway 59 / Yahara River near Fulton gauge access
DirectionsOpen map

Stebbinsville Road is an intermediate reference only. Do not plan it as the routine take-out because recent sources document private-property conflict and signage there.

Road shuttle

Stage Highway 59 first, then return to Highway N below Dunkirk. A vehicle shuttle is cleaner than relying on narrow rural shoulders, and Highway 59 also gives a same-day look at the selected gauge corridor.

Choose a shorter tripOptional

Choose your launch and take-out

This changes launch and take-out logistics, not today's river score.

On-water distance6.9 miCreek-focused
On-water timeAbout 2.5 hr to 4 hrFull route option
ShuttleCar shuttleChoose a shorter in/out pair for a shorter day.

Highway N bridge access below Dunkirk Dam to Highway 59 / Yahara River near Fulton gauge access is about 6.9 mi. Use the planner to compare shorter access pairs.

Additional access notes
  • Highway 59 is the planned take-out and the live Fulton gauge location. Confirm bank footing, traffic, parking, and any posted access limits from land before launching.
More route and safety guidance
  • WRT marks Highway 59 as a decent public access and the Fulton gauge sits at that bridge, but same-day bank footing and parking checks still matter.
  • The Fulton gauge is downstream from the Badfish Creek confluence and MMSD-influenced flow changes, so pair the number with visual checks at Highway N, Stebbinsville, and Highway 59.
Terms and safety
Plan this paddle

Choose your trip times

No account needed. Check the selected access points above, then choose both dates and times. For an overnight paddle, set take-out to the following date.

Trip schedule

Times use the selected time zone. Check it against the river’s location before saving or sharing.

Browser plans stay on this device. Sharing opens your device’s share tools or gives you text to copy.

Download GPX Route geometry only; no schedule required.

Conditions

Check the forecast and local water levels before launching.

Recent trend

Checking preferred range.

Checking trend.

------------
Detailed weather

Hourly forecast

Checking weather.

Loading today's forecast.

Short-route forecast

Checking the next several hours.

Checking the best short-route window.
----Loading--

Tomorrow and the weekend

Forecasts can change. Check current conditions again before leaving.

TomorrowChecking

Waiting on forecast.

WeekendChecking

Waiting on forecast.

Station details and river cameras

Sources and methodology

Review source dates and published guidance below. We have not inspected this trip in person.

Published evidence and verification notes

These notes cover the access details, route quirks, and source caveats most likely to matter once you get there.

  • Route and access sequenceHighway N to Stebbinsville 4.8 mi, then Stebbinsville to Highway 59 2.1 mi

    WRT documents the Highway N launch below Dunkirk, the Stebbinsville split, and Highway 59 as a public access downstream.

    Source

  • Access coordinatesHighway N 42.8788522, -89.210117; Highway 59 gauge 42.82638889, -89.1719444

    WRT links a Dunkirk/Stebbinsville map with the Highway N route coordinate, and USGS site metadata resolves the Fulton gauge at the Highway 59 bridge.

    Source

  • Threshold ladder201-400 cfs target; 0-200 shallow but usually navigable; 801+ very high

    Wisconsin River Trips ties the Dunkirk reach to the Yahara near Fulton gauge and publishes a route-specific cfs ladder with a proxy caveat for Badfish/MMSD effects.

    Source

  • Gauge check during route review · 2026-07-23USGS 05430175 103 cfs / 3.83 ft at 2026-07-23 14:00 CDT

    This reading was saved when we checked the guide. It is not today’s water level. Check the current gauge and local conditions before paddling.

    Source

Check the source links
Other routes nearby

See something outdated?

Access, hazards, wood, and shuttle details change. Send a quick correction if something looks off.