Kentucky | Mammoth Cave

Green River

Green River Ferry to Houchins Ferry

Check current paddling conditions for this Green River route, including water level, recent gauge trend, weather, and route details.

Pulling the latest gauge and weather. This usually takes a few seconds.
Checking live data

Route snapshot

Loading the route snapshot. This usually takes a few seconds.

Route alerts

Email me when this route improves

We'll email you when this route climbs into Good or Strong. Every email includes an unsubscribe link.

We only email on a new threshold crossing.

Get the answer fast, then scan the route.

Start with the verdict, current conditions, route plan, and quick facts before you commit to the drive.

LevelCheckingChecking
TrendCheckingChecking 24h change
WeatherLoadingAir: No reading
RainLoadingRecent rain: Checking

Recent trend

Checking preferred range.

Checking trend.

------------

Best window today

Checking weather.

Short-route forecast

Checking the next several hours.

Checking the best short-route window.
----Loading--
DifficultymoderateNPS calls this a longer, less-traveled flatwater section with swift current, ferry interaction at the launch area, changing gravel bars, and logjams. The route is accessible to experienced casual paddlers when the gauge is in range, but it is not a lazy float.
PermitsNone notedNo permit is required for a same-day paddle, but this route is inside Mammoth Cave National Park and follows NPS boating rules. If you intend to camp on gravel bars or low banks en route, NPS requires a valid riverside camping permit; do not assume spontaneous camping is legal.
CampingOptions nearbyThis is the strongest Green River route in this pass for overnight flexibility. NPS says lower-water gravel bars and low riverbanks can support paddler camping with a valid riverside camping permit, and Houchins Ferry Campground also offers legal endpoint camping with campsites, toilets, and picnic facilities.
SeasonApr-OctThis longer park segment is best treated as a warm-season trip unless the group is comfortable with colder water and faster current. NPS warns the Green can rise quickly after rain and that river channels and gravel bars shift over time.

Dial in the shuttle, distance, and access.

Use this section once the route looks viable and you need to turn it into an actual trip plan.

Access, shuttle, and map

Launch below Green River Ferry and continue downstream to Houchins Ferry for a quieter, longer Mammoth Cave Green River run. The direct Mammoth Cave gauge anchors the route, but the current July 14 stage sits above the broad beginner-friendly band and should be treated as consequential experienced water.

Start

Put-in

Green River FerryOpen map

Launch and load on the downstream side of Green River Ferry so you do not interfere with ferry operations.

Finish

Take-out

Houchins FerryOpen map

Houchins Ferry has the easiest overnight support in this route family, but the ramp and campground still sit inside a managed park setting with posted quiet-hour and facility rules.

Pulling access map tiles. Usually under 5 seconds.

Access caveats and watch for

Access caveats

  • Launch and load on the downstream side of Green River Ferry so you do not interfere with ferry operations.
  • Houchins Ferry has the easiest overnight support in this route family, but the ramp and campground still sit inside a managed park setting with posted quiet-hour and facility rules.
  • On-route camping requires a valid riverside permit and is flow-dependent. Use only legal gravel-bar or low-bank sites allowed by park rules.
  • This longer stretch is less traveled than Dennison-to-Green River Ferry, so groups should be more self-sufficient about shuttle, weather, and emergency planning.

Watch for

  • Ferry traffic at the launch, plus submerged trees, logjams, gravel-bar shifts, back channels, and drifting debris throughout the run.
  • Higher water above about 15 ft, when the route becomes more consequential, and launch closures at or above 20 ft.
  • Cold springs, exposed sun, limited cell service, and fewer nearby bailout options than the shorter park segment.
  • Camping mistakes: rising overnight water, unsecured boats, and unauthorized stops without a valid permit.

Check the data behind today's call.

Use this section when the page shows stale data, limited confidence, or a call you want to verify before driving.

Read quality
Checking live inputs.

Pulling the latest gauge and weather. Usually under 10 seconds.

Gauge inputChecking

Waiting on the gauge read.

Weather inputChecking

Waiting on weather.

Next stepChecking

Waiting on enough data to give the next step.

Today's data confidence is checking

Data confidence mostly comes down to three things: how direct the gauge is, how clear the range is, and how fresh the data is.

  • Checking data confidence notes.
Tomorrow and weekend

This is a cautious early look. If the data is too thin, we leave it out.

TomorrowChecking

Waiting on forecast.

WeekendChecking

Waiting on forecast.

Gauge, thresholds, and timing

These are the live readings and threshold notes behind today's score.

Gauge siteGreen River at Mammoth Cave, KY
Gauge heightChecking
DischargeChecking
24h trendChecking
24h changeChecking
Current bandChecking
Rain last 24hChecking
Rain last 72hChecking
Air tempChecking
Water tempChecking
WindChecking
GustsChecking
Rain timingChecking
Target band9.00 ft to 15.00 ft
Low threshold9.00 ft
High threshold20.00 ft
Data confidence behind the rangeOfficial data source
Gauge observedChecking
Paddle Today updatedChecking
Main source behind this scoreMammoth Cave NPS Green River skill-level stage guidance
Gauge sourceChecking
Weather sourceChecking
Rainfall sourceChecking
What to know before you go

These notes cover the access details, route quirks, and source caveats most likely to matter once you get there.

  • Official route segmentGreen River Ferry to Houchins Ferry, about 12.3-12.4 mi

    KDFWR lists Green River Ferry to Houchins Ferry as a 12.3-mile Pool 6 segment, and NPS separately publishes the same park trip as 12.4 miles with an estimated 4 to 6 hours of travel time.

    Source

  • Official stage model9-15 ft broad audience, >=20 ft closed

    NPS says beginner Green River conditions in the park are about 9 to 15 ft and park launching is prohibited at or above 20 ft. Paddle Today uses that as a conservative public-facing stage model.

    Source

  • Put-in accessGreen River Ferry, 37.1795, -86.1123

    KDFWR identifies Green River Ferry as a free single-lane paved park ramp with year-round availability, picnic tables, and access near Mammoth Cave Campground.

    Source

  • Take-out accessHouchins Ferry, 37.2024, -86.2376

    KDFWR identifies Houchins Ferry as a free paved park ramp with year-round camping, restrooms, picnic facilities, and ferry-side access support.

    Source

  • Live-gauge supportUSGS 03309000 at 3950 cfs / 16.15 ft

    USGS Water Services returned same-day July 14, 2026 values of 3950 cfs and 16.15 ft for Green River at Mammoth Cave, above the broad beginner-friendly 9 to 15-foot band but below the NPS 20-foot launch closure.

    Source

  • Camping contextPermitted riverside camping plus Houchins campground

    NPS says this route can support gravel-bar or low-bank camping at lower water with a valid riverside camping permit, and Houchin Ferry Campground itself offers developed endpoint camping.

    Source

Check the source links

Photos, paddler notes, and updates.

See what others have shared, then add a condition report, upload photos, or flag anything that needs fixing.

Help build the route page

Add photos or send a quick condition report.

Photos

Upload route photos

Add access, hazard, or on-water photos.

No files selected yet.

Compare another stretch on this river, or jump to nearby options before you pick a plan.

Green River paddling FAQ

What water level is good for paddling Green River?

Paddle Today watches Green River at Mammoth Cave, KY and treats 9.00 ft to 15.00 ft as the target band for this route, with weather and recent trend included in the final score.

Where does this Green River route start and end?

This route starts at Green River Ferry and ends at Houchins Ferry, about About 12.3 mi on the water.

Is this Green River route good for beginners?

This is listed as a moderate route. Expect more planning than an easy float, and use the live score, route notes, and source links before committing.

See something outdated?

Access, hazards, wood, and shuttle details change. Send a quick correction if something looks off.