Iowa | North-Central Iowa

Lizard Creek

Rasch Access to Phinney Park

Check current paddling conditions for this Lizard Creek route, including water level, recent gauge trend, weather, and route details.

Route location

Loading the route snapshot. This usually takes a few seconds.

Open access map
DistanceAbout 5.6 to 6 mi
DifficultyHard
Typical timeAbout 3 hr to 5 hr
ShuttleCar shuttle
Aerial orthoimagery shows the Lizard Creek paddling corridor west of Fort Dodge, Iowa.
River contextLizard Creek corridor west of Fort Dodge river-level photo — not necessarily this exact reach.Photo by U.S. Geological Survey, National Geospatial Program

Need to know

Why this call
Pulling the latest gauge and weather. This usually takes a few seconds.
View Primary Source

Route alerts

Email me when this route improves

We'll email you when this route climbs into Good or Strong. Every email includes an unsubscribe link.

We only email on a new threshold crossing.

Gauge history and hourly forecast

The top card is the quick read. This lower section keeps the longer gauge trend, gauge context, and hourly forecast together.

Gauge history & hourly forecastDetailed view

Recent trend

Checking preferred range.

Checking trend.

------------

Hourly forecast

Checking weather.

Loading today's forecast.

Short-route forecast

Checking the next several hours.

Checking the best short-route window.
----Loading--

Quick facts and what's next

Distance, difficulty, shuttle basics, and the near-term outlook before you commit to the drive.

DifficultyhardThis is the most challenging Lizard Creek split: DNR rates it advanced and AW flags Class 2 rapids in the final mile near Fort Dodge.
PermitsNone notedNo route-specific paddling permit is known. Use only the public water-trail accesses, follow Iowa boating and PFD rules, and obey posted Webster County / Iowa DNR access rules.
CampingDay tripNo on-route camping. Iowa DNR says Lizard Creek is non-meandered and private outside public areas, and this lower reach finishes in the Fort Dodge corridor rather than a camping corridor.
SeasonApr-OctSpring and post-rain windows are most reliable, but this lower challenge reach should be avoided when the gauge is below the AW floor, rising quickly, or above the published optimum window.

Upcoming outlook

These are early planning reads. Re-check live conditions before you commit to the drive.

TomorrowChecking

Waiting on forecast.

WeekendChecking

Waiting on forecast.

Plan your trip

Launch points, shuttle details, distance, and access notes.

Access and shuttle

Launch at Rasch Access and take out at Phinney Park for the hardest Lizard Creek split. Iowa DNR rates this reach advanced, with at least 25 rocky riffles or rapids and a final approach just above the Des Moines River.

Take the plan with you

Download the canonical route, add a calendar hold, or send a simple float plan to your group.

Start

Put-in

Rasch Access
Open map

Rasch is the preferred put-in for the lower challenge reach and sits near the selected direct USGS gauge. Confirm the gauge trend and the creek visually before launching.

Finish

Take-out

Phinney Park
Open map

Phinney Park is on river right a few hundred yards above the Des Moines River confluence. Identify the landing and do not drift past it unless intentionally continuing on a separate Des Moines River plan.

Plan this segment

Skip map

Pulling access map tiles. Usually under 5 seconds.

End of map
Access caveats and watch for

Access caveats

  • Rasch is the preferred put-in for the lower challenge reach and sits near the selected direct USGS gauge. Confirm the gauge trend and the creek visually before launching.
  • Phinney Park is on river right a few hundred yards above the Des Moines River confluence. Identify the landing and do not drift past it unless intentionally continuing on a separate Des Moines River plan.
  • The lower corridor passes highway bridges and an industrial Fort Dodge zone. Expect more debris and water-quality uncertainty than the upper wooded reaches.

Watch for

  • At least 25 rocky riffles or rapids, including Class 2-style features in the final mile noted by American Whitewater.
  • Fallen trees, sweepers, bridge abutments, rock gardens, hidden boulders, and fast post-rain rises.
  • Low stages below 5 ft, when carries and pinning risk increase, and stages above 8 ft, when AW guidance no longer supports a normal app recommendation.

Why this score

See the gauge, weather, and source notes behind today's call.

Read quality
Checking live inputs.

Pulling the latest gauge and weather. Usually under 10 seconds.

Gauge inputChecking

Waiting on the gauge read.

Weather inputChecking

Waiting on weather.

Next stepChecking

Waiting on enough data to give the next step.

Today's evidence strength is checking

Evidence strength mostly comes down to three things: how direct the active gauge is, how clear the range is, and how fresh the data is.

  • Checking evidence-strength notes.
Gauge, thresholds, and timing

These are the live readings and threshold notes behind today's score.

Gauge siteLizard Creek near Fort Dodge, IA
Gauge heightChecking
DischargeChecking
24h trendChecking
24h changeChecking
Current bandChecking
Rain last 24hChecking
Rain last 72hChecking
Air tempChecking
Water tempChecking
WindChecking
GustsChecking
Rain timingChecking
Target band5.00 ft to 8.00 ft
Low threshold5.00 ft
High threshold8.00 ft
Evidence strength behind the rangeLocal route guidance
Gauge observedChecking
Paddle Today updatedChecking
Main source behind this scoreAmerican Whitewater Lizard Creek optimum stage guidance
Gauge sourceChecking
Weather sourceChecking
Rainfall sourceChecking
What to know before you go

These notes cover the access details, route quirks, and source caveats most likely to matter once you get there.

  • Current gauge check4.56 ft at 2026-07-23 02:15 CDT

    USGS Water Services returned current Lizard Creek stage during this run. The request did not return current discharge, so this card scores stage only.

    Source

  • Threshold range5-8 ft optimum

    American Whitewater ties the Lentsch-to-Phinney reach to the USGS Lizard Creek near Fort Dodge gauge and lists 5 to 8 ft as optimum paddling levels.

    Source

  • Route shapeAbout 5.6 to 6 miles

    American Whitewater lists Rasch-to-Phinney as about 5.6 miles; the Iowa DNR / Webster County brochure lists the stream reach as 6 miles.

    Source

  • Advanced reachAt least 25 rocky riffles or rapids

    The Iowa DNR / Webster County brochure says the Rasch-to-Phinney section is the most challenging Lizard Creek segment and rates it advanced.

    Source

Check the source links

Use these links to double-check the gauge, route details, and access notes before you head out.

Paddler reports

See recent photos and notes from people on the route.

Help build the route page

Add photos or send a quick condition report.

Photos

Upload route photos

Add access, hazard, or on-water photos.

No files selected yet.

Compare another stretch on this river, or jump to nearby options before you pick a plan.

Lizard Creek paddling FAQ

What water level is good for paddling Lizard Creek?

Paddle Today watches Lizard Creek near Fort Dodge, IA and treats 5.00 ft to 8.00 ft as the target band for this route, with weather and recent trend included in the final score.

Where does this Lizard Creek route start and end?

This route starts at Rasch Access and ends at Phinney Park, about About 5.6 to 6 mi on the water.

Is this Lizard Creek route good for beginners?

This is listed as a hard route. Treat the live score as a planning aid, then confirm conditions, hazards, access, and group skill before launching.

See something outdated?

Access, hazards, wood, and shuttle details change. Send a quick correction if something looks off.